Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
•Fire and Explosion Risk Analysis (FERA)
•Quantitative Risk Assessment (QRA)
•Occupied Building Risk Assessment (OBRA)
•Smoke and Toxic Gas Dispersion Analysis
•Flare Heat & Dispersion Study
•Noise Modeling, Mapping and Control Studies
•Passive Fire Protection – Fireproofing Engineering - NFPA 850, ISO 22899
•Fire and Gas (F&G) Mapping (2D and 3D)
•Layout Safe Distance and Equipment Sitting Assessment
•Hazardous Area Classification and Schedule Development (HAC)
•Consequence Modeling Computational Fluid Dynamics (CFD) -
•Dust Explosion Consequence Analysis
•Bowtie Analysis and Visualization - CCPS Guidelines for Risk Based Process Safety, CGE Barrier Management.
•Major hazard identification register (MHIR) (MAH)
•Safety-Critical Equipment Identification and Categorization (SCE) -
•Performance Standard Development (PS)
•Safety Case Development – HSE Safety Case - HSE UK Safety Case Regulations
•Hazard and Operability Study (HAZOP)
•HAZID-ENVID-OHID Studies including Check List / What If
•ALARP Demonstration Study - HSE UK ALARP Guidelines
•Layer of Protection Analysis for SIL determination (LOPA)
•Process Safety Management GAP Analysis - Audit - OSHA 1910.119, CCPS Guidelines for Risk Based Process Safety
•Matrix of Permitted Operations Assessment (MOPO)
•Simultaneous Operation Assessment (SIMOPS)
•Emergency Response Plan development (ERP)
•Emergency Access and Egress Assessment (EAEA)
•Escape, Evacuation and Rescue Assessment (EERA)
•Establishing Management Of Change (MOC)
•Ignition Source Risk Assessment (Mechanical / Electrical)
•Emergency System Survivability Assessment (ESSA)
•Control of Substances Hazardous to Health Assessment (COSHH)
•Hazardous Material Assessment Study (HAZMAT)
•Water / Foam Demand calculations for the WCC
•Establish fire zones for each area
•Develop a complete package for Passive fire protection
•Equipping each fire zone with proper FF elements
•Develop layout for network and elements
•Develop Hydraulic Calculation for the network
•Develop coverage area in case of water spray system
•Develop Technical Data (TDS) Sheets
•Prepare a complete detailed Engineering package
•Review vendor print and ensure requirements are implemented
•Provide complete Engineering support during purchasing and Construction
Copyright © 2024 Raven Energies - All Rights Reserved.
This website and its content are the exclusive property of Raven Energies. Unauthorized use, reproduction, or distribution of any material on this site is prohibited. Trademarks, logos, and service marks displayed are the property of Raven Energies or their respective owners.
No part of this site may be reproduced or transmitted without prior written permission from Raven Energies. For inquiries, please contact us at [info@raven-energies.com].
Raven Energies respects intellectual property rights and expects the same from users. For copyright concerns, notify us immediately.
Powered by Raven Energies- Dubai
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.